Site logo



Getting Ready at Communal...



edge

Tonight’s Soft Opening…

Everyone is working hard getting ready for tonight’s Soft Opening—the butcher, the baker, the candlestick maker. Above, our muralist Jamal is hand-painting our signage onto our re-plastered building facade.
Meanwhile, inside our cooks were prepping for tonight’s offering, and workers were putting finishing touches on our new space. Our entry pergola (Image 1) features producing grapevines; our Bar Trellis (we’re still working on the lighting for this) is nearly finished (Image 2); Chef Art Martinez and his team (l-r Isael, Art, Rafa, and (not pictured) Richard) are prepping the bases and sauces (Image 3); Spices line one of the upper shelves (Image 4); Some of our offerings on tap (Image 4 and 5); Beer and wine glasses are at the ready (Images 6 and 7); Servicing one of the taps, while Keith sets some bar equipment beyond (Image 8); and workers installing low-voltage lines (Image 9).

gallery

gallery

gallery

gallery

gallery

gallery

gallery

gallery

gallery

gallery

Back to Sketchbook

Back to Home