HLS Framing Pt. 1


edge


First Floor, First Floor Walls, and Second Floor Framing…

With our basement walls complete and fully cured, our framing crew could begin laying the first floor joists and walls, and the complicated second floor framing. Above, Chris McCullough (center left) and Miguel Mendoza (center) finish installing a beam ledger over, and on the sides of, a steel beam over the Kitchen. Beyond (left) the rest of the crew works on installing joists over the Family Room. This complicated framing anticipates above it the southeast corner of the Master Bedroom (which will support a large glulam beam overhead), and is surrounded on two sides by an exterior deck.